A Precision Machinery Enterprise — Annual Operations Management Coaching
20+ Coaching Sessions · 8-Unit KPI System
Company Background
A precision machining enterprise specialising in CNC machined parts and mould development and manufacturing, with a headquarters and an off-site machining base, comprising about 8 departments including sales, engineering, production planning, finished goods, quality assurance and administration. Its end customers are in the smart mobility and consumer electronics industries; the quality system operates under the IATF16949 framework and undergoes customer second-party audits.
Project Background
The company received multiple non-conformities and observations in a customer second-party audit, which also exposed systemic issues such as missing stage reviews in new project development, recurring customer complaints, and inadequate execution of on-site inspection and non-conforming product handling. An annual cooperation coaching programme was therefore introduced: based on the IATF16949 framework, long-term coaching combining training and hands-on project guidance was carried out around the process approach, R&D and project management, KPI performance, supplier management and on-site quality execution.
Diagnosis
New project development lacked a complete set of APQP/PPAP working standards, and project stage reviews were not genuinely operating; customer complaint handling focused on response reports, lacking root cause identification and improvement verification; first/last-piece and patrol inspection execution problems were concentrated (inspection items not matching drawings, measurements not recorded, etc.); machining site records for setup parameters, tool life and equipment point checks were missing; problem analysis lacked teamwork and improvements remained on paper.
Project Content
Modules were advanced per the annual coaching plan: IATF16949 fundamentals (process approach and turtle diagrams, COP/SP/MP process classification, quality manual and documentation structure review); company-level KPI setting and operation management; the design and development process (APQP, PPAP, FMEA/CP/SPC/MSA, with case reviews and execution verification on a real new project); leadership standardisation for operations (weekly/monthly/annual plans and management reviews, tiered meetings, internal system and layered process audits, customer audit response); supplier management (admission evaluation, monthly/annual performance, risk supplier handling); rapid response and problem solving (5Why, 8D, fishbone diagrams, closed-loop complaint root causes); engineering change management (design and 4M changes); 5S and visualisation, product traceability (coding/batch/location/FIFO/kanban); basic lean production; and business process management (job descriptions and competency requirements, customer development methodology, and rebuilt quotation, order and shipping processes).
Quantified Results
- 20+ on-site coaching sessions cumulatively (32 planned, 9 cancelled)
- 10+ concentrated training sessions covering quality, engineering, production and sales middle management and above
- A KPI system covering 8 units (including company level), with targets, calculation methods, source forms and quarterly attainment tracking
- 10+ process and working documents delivered or updated (customer communication and satisfaction surveys, non-conforming product control, project management, quotation operations, new customer/project development, supplier management, mould development management, etc.)
- Customer audit non-conformities and observations turned into improvement action plans with closed-loop tracking
- About 40 consultant man-days planned across the 10 coaching modules