An Automotive Parts Enterprise — VDA6.3 Audit Coaching

VDA6.3 Self-Assessment 84.9% PASS

Company Background

A manufacturer of precision machined automotive parts, specialising in key shaft parts for gearboxes, high-precision shaft components for new energy vehicles, high-lock nuts and other precision components; equipped with multi-axis linked CNC machines and multi-spindle automatic lathes, with CMM, roughness and profile measurement and 100% CCD image inspection capabilities. The engineering team provides complete CAD/CAE/CAM solutions and follows the automotive APQP development process; the company holds IATF16949 certification.

Project Background

As a supplier, the company was subject to a potential/annual supplier audit by an international customer (self-assessment on a 0–4 point scale, covering five sections: Overview, Quality, Engineering & Manufacturing, Leadership and Supply Chain). Ahead of the customer’s formal audit, an on-site coaching programme of about two weeks (13 working days) was commissioned to complete the self-assessment evidence for each module per the customer’s audit checklist and to implement on-site execution.

Diagnosis

Multiple sub-modules of the self-assessment scored in the low band (lean manufacturing, cost reduction, product data management, product and customer requirements, staff resource planning, environmental and program management, etc.); the annual internal system audit raised 2 minor non-conformities (missing emergency team roster and key-position backfill plans); on-site execution evidence for 5S and visual management, non-conforming product area control, engineering change logs and supplier performance records needed to be completed.

Project Content

A total of 21 improvements were carried out per the customer’s audit checklist, with the consultant coaching on site and responsible persons from quality, engineering, HR and supply chain cooperating. Quality module: APQP process optimisation and a complete APQP package for a typical part (gate review inputs and outputs, flow chart, PFMEA, control plan, inspection instructions), PPAP completion, GP12 full-process planning, KPI/PPM statistics and quality boards, 8D problem solving, non-conforming product disposal, error-proofing management, and engineering change and supplier management. Engineering & Manufacturing module: on-site implementation of factory 5S and visual management, lean “seven wastes” training with improvement cases, TPM (equipment classification, maintenance instructions, point checks and quick changeover), VAVE cost optimisation, and RoHS/REACH management. Leadership module: completion of ISO14001 and ISO45001 system documentation, corporate social responsibility, employee handbook updates, medium/long-term strategy and HR planning, and organisational structure and training records. Supply Chain module: quotation and order review processes with examples, logistics interruption contingency plans and drills, shipping management, and FIFO stocktaking and batch traceability updates.

Quantified Results

  • Customer supplier self-assessment overall score rate of 84.9% (PASS line 80%), with all 20 sub-modules judged conforming
  • 13 working days (about 2 weeks) of on-site coaching, covering 21 improvements across 4 modules
  • Trial production of a new project achieved key characteristic Cpk 3.68 / Ppk 4.02 (targets ≥1.33 / ≥1.67) with 100% pass rate in QA sampling
  • The three milestones of OTS samples, PPAP submission and mass production for the new project were 100% on schedule
  • A complete APQP/PPAP package, GP12 planning and one set each of ISO14001/ISO45001 system documentation were delivered