CAIJUN Management & Consulting

Case4:Logistics efficiency: 131.9%

1.Enterprise 4, the factory in Changzhou, China, was established in 2007. After more than a decade of operation and development, its product quality and production efficiency have become benchmarks for the entire group, and it has also become a leading enterprise in the Chinese market.。
2.Since 2018, with the rapid development of China's new energy lithium battery industry, the demand for flexible packaging bags in the lithium battery industry has experienced an explosive growth. The production capacity of the Changzhou factory has been unable to meet the current needs of customers and the development of the market.
3.After conducting in-depth market research and a two-year feasibility analysis, the FPS Group has decided to invest in and build a new factory in Ji'an City, Jiangxi Province.
4.The design of the new factory closely follows the trend of technological and management upgrades in the manufacturing industry. It draws on the existing experience of the Changzhou factory and, through meticulous pre-planning and design, lays a solid foundation for long-term development, aiming to become a benchmark in the global bag-filling industry.


1.Logistics efficiency, reduction of operating costs. The proportion of labor hours for material handling in the new factory is 2.85%, compared to 6.61% in the Changzhou factory. The logistics efficiency has increased by 131.9%.

2.To enhance the space utilization rate, the total area of the operation area and warehouse area in the new factory is 18,250 square meters, which is 27% higher than the 24,952 square meters of the Changzhou factory. 。

3.The inventory turnover days have been shortened by 28%, and the average delivery time has been reduced by 42%.

4.The public area of the new factory measures 1,995 square meters, which is 34% larger than that of the Changzhou factory (1,488 square meters). The employees are very satisfied with the public facilities in the new factory. 。

5.The new factory has reserved 2,500 square meters of space for future expansion needs, accounting for 10.7% of the total area.

6.Build a global benchmark factory in the industry .